The Böker Magnum Long Lead EDC 01SC080 is a fancy and slim gentleman’s knife. The Long Lead EDC is enhanced with an 8Cr13MoV steel blade with a slipjoint lock. A slipjoint won’t completely block the blade. As such you can legally carry it with you almost anywhere. 8Cr13MoV is a decent type of steel you can easily sharpen yourself. Great for daily use. You open the knife with two hands with the help of the nailnick.
$25.95 Original price was: $25.95.$18.17Current price is: $18.17.
SKU: A25PD 310393385 Categories: Gentleman's knives, Pocket knives
- Free Shipping Worldwide
- Shop with ease, buy with confidence.
- Nature-friendly materials, for a better planet.
- Free Shipping over $25

| BrandBöker | Brand |
|---|---|
| Finish bladesatin | Finish blade |
| Way of sharpeningflat, Secondary V-edge | Way of sharpening |
| Can be opened with one handNo | Can be opened with one hand |
| Lockslipjoint | Lock |
| Pocket clip sideright | Pocket clip side |
| Pocket clip positiontip-down | Pocket clip position |
| Pocket clipyes, tip-down (right) | Pocket clip |
| Typeeveryday carry, gentleman’s knife | Type |
| Opening systemnail nick | Opening system |
| Toolsknife | Tools |
| Type of edgeplain edge | Type of edge |
| Blade shapedrop point | Blade shape |
| Right or left-handedsymmetrical | Right or left-handed |
| Hardness57 HRC | Hardness |
| Colourblack | Colour |
| Type of steel8Cr13MoV | Type of steel |
| Material handleG10 | Material handle |
| Weight78 g | Weight |
| Total length18.4 cm | Total length |
| Closed length10.4 cm | Closed length |
| Blade thickness2.7 mm | Blade thickness |
| Blade length8 cm | Blade length |
| UK Carry FriendlyNo | UK Carry Friendly |
| Article numberBO01SC080 | Article number |
| Country of originChina | Country of origin |
| SeriesMagnum | Series |
| Warranty on materials and manufacturing defectslifetime | Warranty on materials and manufacturing defects |
| Can be engravedYes | Can be engraved |
| Number of tools1 | Number of tools |
Be the first to review “Böker Magnum Long Lead EDC 01SC080 Gentleman’s Knife” Cancel reply
Related products
New
Pocket knives
New
Everyday carry knives (EDC)
Civivi Baby Banter C19068S-2 Black G10, Black Stonewashed Pocket Knife, Ben Petersen Design
New
New
Pocket knives
New
Gentleman's knives
New
Pocket knives
New
New


























Reviews
There are no reviews yet.